![]() |
|
PROOF OF DESIGN (POD) – THE DFM/CE BOOK FOR PRINTED CIRCUIT BOARDS, ASSEMBLIES, AND ALL MANNER OF OTHER THINGS TECHNICAL |
|
|
Revision 3 of this E-book (it comes on CD-Rom, in MS Word 97 format) provides more detailed supplier evaluation/qualification guidelines, checklists, procedures, and requirements. It includes PCB/PCBA operational information, Manufacturing Operations Procedures, Failure Analysis information, requirements, and details. It has a complete section on Lean Manufacturing – plus much more DFM/CE and other vital information for those needing/wishing/wanting/desiring to manage processes instead of reacting to results as poor quality and reliability. |
|
|
|
|
FORWARD (advance – or move positively in one direction – or never move backward - or never do it over – or never effect defect and have to correct it): This book is about doing it right the first time, on time, every time, at the lowest costl This simply is done by manageing processes instead of results. Nike says Just do it. MoonMan says Just do it but do it right. MoonMan also says let’s Boogie (MoonMan’s expression for let’s move forward or let’s get it on) and get down to it. You should ask the MoonMan about product with DFM/CE on the pics. |
|
Product without DFM/CE |
Product with DFM/CE |
|
|
|
||
|
|
|
|
© 2003-2004 Daan Terstegge - All rights reserved. |